    @lowendmeow said: THank you merry Christmas! Will there be any christmas promos?

    Thank you, and Merry Christmas!

    At the moment, we’re not running any Christmas promotions. We decided to focus our time on resolving ongoing backup API issues, as ensuring service reliability is more important to us than announcing new offers that could be affected by the same problems.

    Once everything is fully stable, we’ll revisit new promotions and service announcements.

    Host-C | Storage by Design | AS211462

    “If it can’t guarantee behavior under load, it doesn’t belong in production.”

  • @host_c said:

    @lowendmeow said: THank you merry Christmas! Will there be any christmas promos?

    Thank you, and Merry Christmas!

    At the moment, we’re not running any Christmas promotions. We decided to focus our time on resolving ongoing backup API issues, as ensuring service reliability is more important to us than announcing new offers that could be affected by the same problems.

    Once everything is fully stable, we’ll revisit new promotions and service announcements.

    that makes sense I'm glad you're focusing on sustainability!! That's what I thought but didn't hurt to check. Best of luck with the migrations

  • host_chost_c Provider
    edited December 2025

    @lowendmeow said:

    @host_c said:

    @lowendmeow said: THank you merry Christmas! Will there be any christmas promos?

    Thank you, and Merry Christmas!

    At the moment, we’re not running any Christmas promotions. We decided to focus our time on resolving ongoing backup API issues, as ensuring service reliability is more important to us than announcing new offers that could be affected by the same problems.

    Once everything is fully stable, we’ll revisit new promotions and service announcements.

    that makes sense I'm glad you're focusing on sustainability!! That's what I thought but didn't hurt to check. Best of luck with the migrations

    Thanks 🙂
    By the time we’re done, we’ll probably call this phase the “December 2025 HOST-C PURGE” 😄

    Stuart actually started calling it that, so credit where credit is due — and honestly, he’s kinda right.

    Small update on the backup situation

    Backups are getting done — they always were — but they weren’t showing up in the panel. We’ve now traced this back to the core issue.

    When we upgraded the provisioning module from v3.x to v4.x (about 6 months ago), everything went by the book except for one thing:
    in the database, some backup locations (destination servers) ended up duplicated or even triplicated.

    As a result, every backup job was physically executed correctly, but when it tried to write the record back to the database, it hit the classic
    “duplicate shit exists, aborting” error — so nothing appeared in the UI.

    We’re currently fixing this without doing a full wipe of settings or causing downtime, and I’m confident we’ll have it sorted shortly.

    And yes… right after that, we move on to the next fuckup 😅
    The IPv6 migration — from stateless to fully routed IPv6.

    What we have now works, but it doesn’t scale anymore — at least not in my vision — so that change is unavoidable. ( As Thanos said "INEVITABLE" )

    Fun times ahead 🚀

    Host-C | Storage by Design | AS211462

    “If it can’t guarantee behavior under load, it doesn’t belong in production.”

  • host_chost_c Provider
    edited January 2

    Updates

    Backups for some services are already visible in the user panel.
    While not all services are fully fixed yet, progress is ongoing and we are steadily getting there.

    During debugging, we also identified additional issues which have already been resolved. However, some remaining fixes will require a complete power-off and power-on, not only of individual services, but also of entire nodes.

    Unfortunately, there is no safe way around a full shutdown for these changes. We attempted yesterday to apply part of the fixes without taking services fully offline; however, this approach proved unreliable and ultimately forced us to reboot a node. Based on this outcome, we have decided to proceed with a properly planned and controlled maintenance window to avoid unplanned disruptions.

    📅 Scheduled Full Maintenance – January 31, 2026

    Given the requirement for a full power-off, we will also take this opportunity to perform a major platform upgrade. As a result, we are scheduling a complete infrastructure maintenance on January 31, 2026.

    This maintenance will include the following major items (and a few smaller related fixes):

    CPU configuration adjustment to resolve a performance-impacting flag
    (issue discovered on 02-01-2026)
    
    Final implementation of API Panel communication
    (work started in December 2025)
    
    Upgrade of Proxmox VE from version 8.4 to 9.1
    
    Firmware updates on hardware controllers within the Scale Gen 2 platform
    
    Various firmware updates on networking devices
    

    ⏱️ Expected duration

    This will be a long maintenance window:

    Proxmox upgrade alone: approximately 4–6 hours

    Remaining work (controller and networking firmware updates) involves slow, sequential processes

    Total estimated duration: 8–12 hours

    Most of the smaller fixes are already prepared and only require node reboots. The firmware updates on controllers and networking equipment are the most time-consuming part of this maintenance.

    🔒 Client Area Access

    To avoid accidental power-on or management actions during the maintenance window, access to the client area will be temporarily restricted for the duration of the maintenance.

    Further updates will be posted as we get closer to the maintenance window.

    HOST-C Team

    PS: "We appreciate your patience and understanding" - I know I have said this before a few lot of times, I know downtime is not something you want, and it is something that we as a hosting company definitely do not wish fore, unfortunately there are processes that require to take offline the server/appliance/device.

    @Neoon; @AuroraZero and others that have services with us, please announce your customers also.

    Host-C | Storage by Design | AS211462

    “If it can’t guarantee behavior under load, it doesn’t belong in production.”

  • @host_c said:
    Updates

    Backups for some services are already visible in the user panel.
    While not all services are fully fixed yet, progress is ongoing and we are steadily getting there.

    During debugging, we also identified additional issues which have already been resolved. However, some remaining fixes will require a complete power-off and power-on, not only of individual services, but also of entire nodes.

    Unfortunately, there is no safe way around a full shutdown for these changes. We attempted yesterday to apply part of the fixes without taking services fully offline; however, this approach proved unreliable and ultimately forced us to reboot a node. Based on this outcome, we have decided to proceed with a properly planned and controlled maintenance window to avoid unplanned disruptions.

    📅 Scheduled Full Maintenance – January 31, 2026

    Given the requirement for a full power-off, we will also take this opportunity to perform a major platform upgrade. As a result, we are scheduling a complete infrastructure maintenance on January 31, 2026.

    This maintenance will include the following major items (and a few smaller related fixes):

    CPU configuration adjustment to resolve a performance-impacting flag
    (issue discovered on 02-01-2026)
    
    Final implementation of API Panel communication
    (work started in December 2025)
    
    Upgrade of Proxmox VE from version 8.4 to 9.1
    
    Firmware updates on hardware controllers within the Scale Gen 2 platform
    
    Various firmware updates on networking devices
    

    ⏱️ Expected duration

    This will be a long maintenance window:

    Proxmox upgrade alone: approximately 4–6 hours

    Remaining work (controller and networking firmware updates) involves slow, sequential processes

    Total estimated duration: 8–12 hours

    Most of the smaller fixes are already prepared and only require node reboots. The firmware updates on controllers and networking equipment are the most time-consuming part of this maintenance.

    🔒 Client Area Access

    To avoid accidental power-on or management actions during the maintenance window, access to the client area will be temporarily restricted for the duration of the maintenance.

    Further updates will be posted as we get closer to the maintenance window.

    HOST-C Team

    PS: "We appreciate your patience and understanding" - I know I have said this before a few lot of times, I know downtime is not something you want, and it is something that we as a hosting company definitely do not wish fore, unfortunately there are processes that require to take offline the server/appliance/device.

    @Neoon; @AuroraZero and others that have services with us, please announce your customers also.

    Thank you for the heads up man I have currently added it to the que to go out next week.

    The Yeti has left the building.

  • @host_c said:
    And yes… right after that, we move on to the next fuckup 😅
    The IPv6 migration — from stateless to fully routed IPv6.

    😉

    We accept Karma donations for the last flan. 🍮 affbrr

  • host_chost_c Provider

    @yoursunny said:

    @host_c said:
    And yes… right after that, we move on to the next fuckup 😅
    The IPv6 migration — from stateless to fully routed IPv6.

    😉

    =) =)

    I knew that will get your attention =)

    Host-C | Storage by Design | AS211462

    “If it can’t guarantee behavior under load, it doesn’t belong in production.”

  • FreekFreek OG Crazy Dutch guy

    Just received this email:

    Dear Customer,
    
    We’re writing to inform you about an upcoming change to the lifecycle timeline of your service.
    
    Due to recent and significant increases in hardware replacement costs, maintaining this specific legacy product line beyond its current lifecycle has become unsustainable and is now posing an operational risk. To avoid unexpected disruptions and to operate responsibly under current market conditions, we need to adjust the previously announced end-of-life date.
    
    What’s changing
    
        The original planned end-of-life date was April 2027
        The updated end-of-life date is now 30 April 2026
    
    Customers whose current billing period extends beyond 30 April 2026 will receive a pro-rated refund for any remaining unused service time from 30 April 2026 until the original contract end date.
    
    Transition details
    
    To ensure a smooth and predictable transition:
    
        Your service will be allowed to renew one final time on a monthly billing cycle only, regardless of any previous yearly payment terms.
        After this final monthly period, the service will be gracefully terminated.
        No further renewals will be possible beyond that point.
    
    Customers who do not wish to continue until the end-of-life date may cancel the service at any time from the client area, and it will not renew again.
    
    What this means for you
    
    This change gives you time to:
    
        plan a migration,
        move data or services elsewhere,
        or reach out to us if you need temporary assistance during the transition.
    
    We understand that changes like this are never ideal. This decision was made with careful consideration, as we believe it is better to responsibly retire certain services than to risk a situation where they can no longer be properly maintained.
    
    Optional migration path (for Pioneer 5TB customers)
    
    For customers who wish to continue with us beyond the end-of-life date, we offer an optional migration to our current-generation Xeon Scalable Gen 2 platform under current terms and pricing.
    
    PX-1C2R5T – Storage 5TB (Xeon Scalable Gen 2)
    
        1 vCPU (Xeon Scalable Gen 2)
        2 GB DDR4 RAM
        20 GB NVMe (OS disk)
        5 TB HDD storage add-on (RAID60)
        4K IOPS @ 1.5K, up to 1 GB/s RW
        1× Dedicated IPv4
        IPv6 /64 available upon request via ticket
        1 Gbps port (best effort)
        18 TB included traffic
    
    Pricing:
    
        $33 / quarter
        $60 / semi-annual (discounted billing option)
    
    Please note: this migration option represents a new service on a different platform and is not a continuation of the legacy product. Migration is entirely optional, and customers are free to choose the solution that best fits their needs.
    
    If you have any questions or need clarification regarding your specific service, billing, refunds, or the migration option, our support team is available and happy to help.
    
    Thank you for your understanding and for being a valued customer, regardless of the option you choose.
    
    
    
    Kind regards,
    
    HOST-C Support Team
    
    Storage by Design
    

    LinuxFreek.com — Thank you for your attention to this matter

  • host_chost_c Provider

    And there is a mail sent out for the 10 TB Nimitz E5-V4 also.

    Host-C | Storage by Design | AS211462

    “If it can’t guarantee behavior under load, it doesn’t belong in production.”

  • @host_c said:
    And there is a mail sent out for the 10 TB Nimitz E5-V4 also.

    New fetish? I don't get this many emails from the Nigerian Prince let alone you usually.

    The Yeti has left the building.

  • host_chost_c Provider
    edited February 4

    @AuroraZero said: New fetish? I don't get this many emails from the Nigerian Prince let alone you usually.

    Well honestly that was one of the hardest e-mails I sent out for a long time.

    I know some people won’t care about the reasoning, and that’s fine, everyone is free to make their own decision.

    But the timeline is clear and final, no delays or other on that matter.

    30 April 2026 is the end-of-life date.
    On 01 May 2026, the services will be powered off and the rack will be returned to the datacenter as agreed.

    I can go into detailed numbers and specifics, but most people won't give 7$ dime, so, it is what it is.

    Host-C | Storage by Design | AS211462

    “If it can’t guarantee behavior under load, it doesn’t belong in production.”

  • @host_c said:

    @AuroraZero said: New fetish? I don't get this many emails from the Nigerian Prince let alone you usually.

    Well honestly that was one of the hardest e-mails I sent out for a long time.

    I know some people won’t care about the reasoning, and that’s fine, everyone is free to make their own decision.

    But the timeline is clear and final, no delays or other on that matter.

    30 April 2026 is the end-of-life date.
    On 01 May 2026, the services will be powered off and the rack will be returned to the datacenter as agreed.

    I can go into detailed numbers and specifics, but most people won't give 7$ dime, so, it is what it is.

    I hear ya man I recently had to discontinue Japan because of upstream disappearance. It kills me to have to do it but, unless I can find reliable upstreams there is no sense in duck waddling.

    The Yeti has left the building.

  • edited February 4

    @Freek said:
    Just received this email:

    Dear Customer,
    
    We’re writing to inform you about an upcoming change to the lifecycle timeline of your service.
    
    Due to recent and significant increases in hardware replacement costs, maintaining this specific legacy product line beyond its current lifecycle has become unsustainable and is now posing an operational risk. To avoid unexpected disruptions and to operate responsibly under current market conditions, we need to adjust the previously announced end-of-life date.
    
    What’s changing
    
        The original planned end-of-life date was April 2027
        The updated end-of-life date is now 30 April 2026
    
    Customers whose current billing period extends beyond 30 April 2026 will receive a pro-rated refund for any remaining unused service time from 30 April 2026 until the original contract end date.
    
    Transition details
    
    To ensure a smooth and predictable transition:
    
        Your service will be allowed to renew one final time on a monthly billing cycle only, regardless of any previous yearly payment terms.
        After this final monthly period, the service will be gracefully terminated.
        No further renewals will be possible beyond that point.
    
    Customers who do not wish to continue until the end-of-life date may cancel the service at any time from the client area, and it will not renew again.
    
    What this means for you
    
    This change gives you time to:
    
        plan a migration,
        move data or services elsewhere,
        or reach out to us if you need temporary assistance during the transition.
    
    We understand that changes like this are never ideal. This decision was made with careful consideration, as we believe it is better to responsibly retire certain services than to risk a situation where they can no longer be properly maintained.
    
    Optional migration path (for Pioneer 5TB customers)
    
    For customers who wish to continue with us beyond the end-of-life date, we offer an optional migration to our current-generation Xeon Scalable Gen 2 platform under current terms and pricing.
    
    PX-1C2R5T – Storage 5TB (Xeon Scalable Gen 2)
    
        1 vCPU (Xeon Scalable Gen 2)
        2 GB DDR4 RAM
        20 GB NVMe (OS disk)
        5 TB HDD storage add-on (RAID60)
        4K IOPS @ 1.5K, up to 1 GB/s RW
        1× Dedicated IPv4
        IPv6 /64 available upon request via ticket
        1 Gbps port (best effort)
        18 TB included traffic
    
    Pricing:
    
        $33 / quarter
        $60 / semi-annual (discounted billing option)
    
    Please note: this migration option represents a new service on a different platform and is not a continuation of the legacy product. Migration is entirely optional, and customers are free to choose the solution that best fits their needs.
    
    If you have any questions or need clarification regarding your specific service, billing, refunds, or the migration option, our support team is available and happy to help.
    
    Thank you for your understanding and for being a valued customer, regardless of the option you choose.
    
     
    
    Kind regards,
    
    HOST-C Support Team
    
    Storage by Design
    

    Is it the new price for legendary pioneer VPS ? (~ x2 :o )

  • host_chost_c Provider
    edited February 4

    @remy

    no, new price is for today list prices minus a big discount.

    That is a new product.

    You have there 2.2 USD / TB. all that for a raid 60 Platform and Xeon Scale Gen CPU.

    Same math went to the Nimitz 10TB, but there there is a monthly payment option to as the value is higher.

    Both of them have a discount on the semi-annual payment.

    Host-C | Storage by Design | AS211462

    “If it can’t guarantee behavior under load, it doesn’t belong in production.”

  • edited February 4

    @host_c said:
    @remy

    no, new price is for today list prices minus a big discount.

    That is a new product.

    You have there 2.2 USD / TB. all that for a raid 60 Platform and Xeon Scale Gen CPU.

    Same math went to the Nimitz 10TB, but there there is a monthly payment option to as the value is higher.

    Both of them have a discount on the semi-annual payment.

    Yes but if i'm not mistaken it was initially $45/year. We are talking about $120 / year now.
    not saying it's a bad deal, but that's still a pretty big gap.
    I mean, cpu does not matter much for most people for storage instance.

    Anyway, I don’t have this VPS anymore. It was reliable while it lasted. :)

  • jqrjqr OG
    edited February 4

    Got the email too. It's understandable, but unfortunate.

    I was hoping to ride it out for the year, hoping the hardware situation would stabilize.

    It's pronounced hacker.

  • host_chost_c Provider
    edited February 4

    @jqr said:
    Got the email too. It's understandable, but unfortunate.

    I was hoping to ride it out for the year, hoping the hardware situation would stabilize.

    So did we sincerely, yet, the $$ for RAM and some DRIVES last week made me reconsider. It is too much of a gamble from my point of view, we have too many customers to "risk" this, it would not be very wise from where I am standing. I also aspect another energy price hike in the coming moths.

    @remy said: Yes but if i'm not mistaken it was initially $45/year. We are talking about $120 / year now.

    not saying it's a bad deal, but that's still a pretty big gap.
    I mean, cpu does not matter much for most people for storage instance.

    True to for most, untrue for us, as 12 bays will not do what 24 do IO wise, there is a limit to witch I can push those nodes. Also, their efficiency is of 2015.

    Fully populated E5-V4 they max out ~430W
    Scale Gen 2 on the worst day ~740W, 640W average.

    2xR730XD = 4U so i can have the same capacity to sell as a R740xd2
    1xR740XD = 2U - also, here i can have 3x8 drive setup in raid 60 that makes a ton of sense technically when you use 18+ TB drives. ( rebuild times )

    And a lot more, CPU BW is 2x of E5-V4, and I can go all day with this.

    One more aspect was the renewal price asked for the rack housing the E5-V4, that was, ~x2
    DDR4 is not cheap for the past moths, ain't seeing a decline soon, and even if so, not to what it was in early 2025 for the moment.
    DRIVES, well, same issue

    All the above in the mix, well, NO.

    If RAM and DRIVES would remained at the end 2024 early 2025, I would had no issues to subsides them till April 2027, with the new variables..... well, nop. ( and none of you would )

    Host-C | Storage by Design | AS211462

    “If it can’t guarantee behavior under load, it doesn’t belong in production.”

  • So this is only for those with Pioneer and Nimitz that did not take the upgrade offer last year right? Those that upgraded would not have any changes right?

    Best and friendliest hosts Host-C , Hostbrr aff.

  • host_chost_c Provider

    @curiouswanderer said: So this is only for those with Pioneer and Nimitz that did not take the upgrade offer last year right? Those that upgraded would not have any changes right?

    Precisely, luck you =) =)

    Host-C | Storage by Design | AS211462

    “If it can’t guarantee behavior under load, it doesn’t belong in production.”

  • imokimok OG Not Administrator

    @host_c said:

    @curiouswanderer said: So this is only for those with Pioneer and Nimitz that did not take the upgrade offer last year right? Those that upgraded would not have any changes right?

    Precisely, luck you =) =)

    Nice. I see my plan is Pioneer XNova and it does not have any changes.

  • host_chost_c Provider
    edited February 5

    If anyone wishes to take the new offer, just reply via ticket and we’ll take care of the migration from our side.

    Also, I see a lot of people suddenly discovered the July and August 2025 offer 😅- now you woken up, nice. :D , fine, but 8 moths too late.

    Just to clarify: that promo ended in 2025 and can’t be provisioned anymore. ( SkyCluster XNova, Pioneer XNova and Nimitz CVN-68 )

    Today options are:

    For the Pioneer -> PX-1C2R5T - Storage 5TB
    For the Nimitz -> PX-2C4R10T - Storage 10TB

    And that is it.

    Host-C | Storage by Design | AS211462

    “If it can’t guarantee behavior under load, it doesn’t belong in production.”

  • @host_c said:
    If anyone wishes to take the new offer, just reply via ticket and we’ll take care of the migration from our side.

    Also, I see a lot of people suddenly discovered the July and August 2025 offer 😅- now you woken up, nice. :D , fine, but 8 moths too late.

    Just to clarify: that promo ended in 2025 and can’t be provisioned anymore. ( SkyCluster XNova, Pioneer XNova and Nimitz CVN-68 )

    Today options are:

    For the Pioneer -> PX-1C2R5T - Storage 5TB
    For the Nimitz -> PX-2C4R10T - Storage 10TB

    And that is it.

    It is never that's it ..... Never!!!!

    The Yeti has left the building.

  • imokimok OG Not Administrator
    edited February 5

    Waiting for services in US.

    Lima, Peru would be better but i'm sure that's impossible.

  • @imok said:
    Waiting for services in US.

    Lima, Peru would be better but i'm sure that's impossible.

    If you wait a bit Peru should become US soon, the upgrade is rolling out starting from the north of the continent

    Happy customer at AlexHost, AxusHost, Bakker-IT, Host-C, Ionos, Veesp + NanoKVM ftw.

  • imokimok OG Not Administrator

    @Shot² said:

    @imok said:
    Waiting for services in US.

    Lima, Peru would be better but i'm sure that's impossible.

    If you wait a bit Peru should become US soon, the upgrade is rolling out starting from the north of the continent

    We are a part of China already. Anyway, with any of them we would have decent DCs in a few years.

  • sh97sh97 Top MJJ

    @AuroraZero said: I hear ya man I recently had to discontinue Japan because of upstream disappearance. It kills me to have to do it but, unless I can find reliable upstreams there is no sense in duck waddling.

    What are you looking for there? Can maybe throw some suggestions.

  • vyasvyas OG
    edited February 6

    Find some crude oil , get annexed

    @imok said:
    Waiting for services in US.

    Lima, Peru would be better but i'm sure that's impossible.

  • So this is a reminder to myself (and a very public reminder at that!)
    Occasionally peek out of the rock.

    Renewed in November, now I see the EOL Message. No emails received about this.

    Glad I read !

  • No email received either

    Happy customer at AlexHost, AxusHost, Bakker-IT, Host-C, Ionos, Veesp + NanoKVM ftw.

  • imokimok OG Not Administrator

    @vyas said:
    Find some crude oil , get annexed

    @imok said:
    Waiting for services in US.

    Lima, Peru would be better but i'm sure that's impossible.

    I live an hour away from an oil-producing area.

    I only see gringos going to the beach, not spreading freedom, yet.

  • @sh97 said:

    @AuroraZero said: I hear ya man I recently had to discontinue Japan because of upstream disappearance. It kills me to have to do it but, unless I can find reliable upstreams there is no sense in duck waddling.

    What are you looking for there? Can maybe throw some suggestions.

    Nothing atm to tbh I am concentrating on the move to lxc from openvz. After that is through beta then I will concentrate on fixing and maybe expanding.

    The Yeti has left the building.

  • somiksomik OG Hostbusters

    @AuroraZero said:
    Nothing atm to tbh I am concentrating on the move to lxc from openvz. After that is through beta thæn I will concentrate on fixing and maybe expanding.

    Wasn't OpenVZ deprecated in 201x?

    I speak fluent sarcasm and broken logic. | I would agree with you, but thæn we’d both be wrong.

  • @somik said:

    @AuroraZero said:
    Nothing atm to tbh I am concentrating on the move to lxc from openvz. After that is through beta thæn I will concentrate on fixing and maybe expanding.

    Wasn't OpenVZ deprecated in 201x?

    Probably but when you get handed a platform and then dumped and you have to reverse engineer everything yourself and live and shit post and everything, things tend to get let's just say messy. No that is not the right word for it ahhh fuckstickingassgobliningwreckedassholestesticulartortioningwonderful!!!! Actually it was 2024, just opened beta on the lxc conversion.

    P.S. @host_c tell Stewart to stop having sex with my vps yesterday it ping ponged like a kid with a yo yo he scared it to death!!!

    The Yeti has left the building.

  • somiksomik OG Hostbusters

    @AuroraZero said:

    @somik said:

    @AuroraZero said:
    Nothing atm to tbh I am concentrating on the move to lxc from openvz. After that is through beta thæn I will concentrate on fixing and maybe expanding.

    Wasn't OpenVZ deprecated in 201x?

    Probably but when you get handed a platform and thæn dumped and you have to reverse engineer everything yourself and live and shit post and everything, things tend to get let's just say messy. No that is not the right word for it ahhh fuckstickingassgobliningwreckedassholestesticulartortioningwonderful!!!! Actually it was 2024, just opened beta on the lxc conversion.

    P.S. @host_c tell Stewart to stop having sex with my vps yesterday it ping ponged like a kid with a yo yo he scared it to death!!!

    Eh.... what?

    I speak fluent sarcasm and broken logic. | I would agree with you, but thæn we’d both be wrong.

  • @somik said:

    @AuroraZero said:

    @somik said:

    @AuroraZero said:
    Nothing atm to tbh I am concentrating on the move to lxc from openvz. After that is through beta thæn I will concentrate on fixing and maybe expanding.

    Wasn't OpenVZ deprecated in 201x?

    Probably but when you get handed a platform and thæn dumped and you have to reverse engineer everything yourself and live and shit post and everything, things tend to get let's just say messy. No that is not the right word for it ahhh fuckstickingassgobliningwreckedassholestesticulartortioningwonderful!!!! Actually it was 2024, just opened beta on the lxc conversion.

    P.S. @host_c tell Stewart to stop having sex with my vps yesterday it ping ponged like a kid with a yo yo he scared it to death!!!

    Eh.... what?

    Exactly

    The Yeti has left the building.

  • HOST-C
    Important Update: Service Suspension &
    From    HOST-C <[email protected]>
    

    Happy customer at AlexHost, AxusHost, Bakker-IT, Host-C, Ionos, Veesp + NanoKVM ftw.

  • host_chost_c Provider

    @Shot² said:
    HOST-C
    Important Update: Service Suspension &
    From HOST-C sales@host-c.com

    Host-C | Storage by Design | AS211462

    “If it can’t guarantee behavior under load, it doesn’t belong in production.”

  • imokimok OG Not Administrator

    @Shot² said:
    HOST-C
    Important Update: Service Suspension &
    From HOST-C sales@host-c.com

  • @imok said:

    @Shot² said:
    HOST-C
    Important Update: Service Suspension &
    From HOST-C sales@host-c.com

  • F: For the Pioneer -> PX-1C2R5T - Storage 5TB

  • @imok said:
    I establish arroz con leche (rice pudding) as the dessert of this thread.

    Expect more news on the weekend.

    Arroz doce in some non-hispanic latin american country.... B)

    The river runs towards the sea, but the sea is never full...

  • somiksomik OG Hostbusters

    @motafokabr said:

    @imok said:
    I establish arroz con leche (rice pudding) as the dessert of this thread.

    Expect more news on the weekend.

    Arroz doce in some non-hispanic latin american country.... B)

    Ah, finally someone using the original cinnamon. I always see people use the "thicker" bark cassia cinnamon (Chinese cinnamon) and not the original thin bark ceylon cinnamon...

    I speak fluent sarcasm and broken logic. | I would agree with you, but thæn we’d both be wrong.

  • host_chost_c Provider

    I wish to use this opportunity to say Happy Easter to all.

    May you spend time with your loved ones, family and friends. ( or as you see fit :D )

    CHEERS!!!!!!!! <3 HOST-C

    Host-C | Storage by Design | AS211462

    “If it can’t guarantee behavior under load, it doesn’t belong in production.”

  • @host_c said:
    I wish to use this opportunity to say Happy Easter to all.

    May you spend time with your loved ones, family and friends. ( or as you see fit :D )

    CHEERS!!!!!!!! <3 HOST-C

    Happy Easter to you!

    I believe in good luck. Harder that I work ,luckier i get.

  • host_chost_c Provider

    While not a promo sale you most wish for, I would recommend you check your e-mails by tomorrow, important stuff regarding your services.

    Cheers!

    Host-C | Storage by Design | AS211462

    “If it can’t guarantee behavior under load, it doesn’t belong in production.”

  • @host_c said:
    important stuff regarding your services.

    oh no, already losing millions in anticipation of my v6 gw changing!

  • host_chost_c Provider

    @eliphas said:

    @host_c said:
    important stuff regarding your services.

    oh no, already losing millions in anticipation of my v6 gw changing!

    Millions????.... ahhh,that is old

    new way is

    =) =)

    Host-C | Storage by Design | AS211462

    “If it can’t guarantee behavior under load, it doesn’t belong in production.”

  • host_chost_c Provider
    edited July 3

    Hy there folks

    I wish to announce that, as of today here on LES, @HOST_C_Padawan is joining the team and will be handling promotions and keeping in touch with you guys whenever I'm unavailable. ( yeah I know, I am kinda absent....... :3 )

    Lately we managed to get some pretty nice implementation projects, and they require a lot of my attention. Unfortunately a day has only 24 hours and it turns out I don't have enough hours to do everything myself, so I decided to expand the team.

    I'm confident he will take good care of all of you. I just ask that you have a little patience with him at the beginning. His English skills are still fairly basic, so there will be a healthy amount of translation software involved in your conversations for a while. That probably means a few funny mistakes here and there. ( I will underline "few" here =) =) =) )

    Please don't beat the crap out of him during the first week... the second week is a different story. B)

    To kick things off, @HOST_C_Padawan will be posting his first promotion announcement tomorrow (if I remember correctly). Let's see how it goes! ;) =)

    THX fellas, and see you soon.

    Cheers!

    Host-C | Storage by Design | AS211462

    “If it can’t guarantee behavior under load, it doesn’t belong in production.”

  • JabJab TOP Member 2027

    I expected more maintenance, it's like a month without any kind of maintenance notifications, this is no like host-c we know.

    Are you guys struggling due to temps in Europe? :D

    Haven't bought a single service in VirMach Great Ryzen 2022 - 2023 Flash Sale.

  • host_chost_c Provider

    @Jab said:
    I expected more maintenance, it's like a month without any kind of maintenance notifications, this is no like host-c we know.

    Are you guys struggling due to temps in Europe? :D

    lol, I can fix the maintenance part if you wish so =) =) .....

    Yes, it is kinda HOT at 38-43 Celsius ( 100 to 109 F for those on the wrong metric system =) =) )

    Host-C | Storage by Design | AS211462

    “If it can’t guarantee behavior under load, it doesn’t belong in production.”